Permits and Fees

If you would like to apply for a permit, please access theREVISED_Permit Application_03.17.2026 then:

  • Fill out and return application to our office by mail or in person
  • Wait for a determination on total amount owed
  • Pay that amount by mail or in person
  • Wait for Codes Enforcement to approve the permit
  • Receive approved permit by mail or pick up in person
  • Begin your project!

Building Permits & Fees

Total Valuation Fee
Total Valuation $0.00 - $15,000 Fee $35 for first $2000 plus $5 for each additional $1000 or fraction thereof, up to and including $15,000
Total Valuation $15,001 - $50,000 Fee $105 for first $15,000 plus $5 for each additional $1000 or fraction thereof, up to and including $50,000
Total Valuation $50,001 - $100,000 Fee $280 for first $50,000 plus $4 for each additional $1000 or fraction thereof, up to and including $100,000
Total Valuation $100,001 - $500,000 Fee $480 for first $100,000 plus $3 for each additional $1000 or fraction thereof, up to and including $500,000
Total Valuation Over $500,000 Fee $1680 for first $500,000 plus $2 for each additional $1000 or fraction thereof

Other Fees

  • Moving of Building Structure: $40.00
  • Demolition of Building Structure: $100.00

Mechanical Permits and Fees

Description Fee
Permit Issuing Fee $10.00
Up to five (5) tons $5.00
For each additional ton over the first five (5) tons $2.00
Heat Pump Only, Issuing Fee $10.00 + $1 for each $50,000 BTU or fraction thereof
New duct work in excess of 30" when pipe is 12" in diameter or less $10.00 Issuing Fee
Inspection heating, ventilation, duct work, air conditioning& refrigeration system $10.00 for first $1000 or fraction thereof, of the valuation of the installation plus $2 for each additional $1000 or fraction thereof.
Reinspection Fee $5.00
Temporary Operation Inspection Fee: If the system is not approved for temporary operation on the first preliminary inspection, the usual reinspection fee will be charged for each subsequent inspection. $5.00

All buildings except 1/2 family dwellings, where self-contained, air conditioned units of less than two tons are to be installed, the fee charged shall be that for the total cost of all units combined.

Plumbing Permits & Fees

Description Fee
Permit Fee, Issuing $5.00
Each fixture or device (add) $1.50
Sewer line or septic tank or interceptor (add) $7.50
Water Line $7.50
Each Reinspection (add) $10.00

Electrical Permits & Fees

Residential and Single Phase Commercial

  • When service work is not involved - $5.00/ea
  • When service work is involved including a new service or changing or enlarging an existing service and includes any other work done behind the service as part of the job - $0.10 per amp

Industrial and Three-phase Commercial

  • When service is not involved - 1/2 of 1% of estimated job costs up to a maximum of $0.25 per amp rating at the existing service entrance with a minimum of $10.00
  • When service work is involved including installing a new service or changing or enlarging an existing service and will include any work to be done behind the service as part of the job - $0.25 per amp

Reinspection (no fault of the City) - $10.00

If any person commences any electrical work where a permit is required without first obtaining such a permit, the fee provided for by this schedule will be doubled.

Planning & Zoning and Zoning & Appeals Fees

Annexations / Zoning Requests Fee
Residential $105 + $11.50 per lot (maximum $1,230)
Planned Development $120 + $11.50 per lot (maximum $2,260)
Commercial / Industrial $180 + $17.50 per acre (maximum $2,370)
Zoning Amendment Request Fee
Residential $105 + $11.50 per lot (maximum $1,230)
Planned Development $120 + $11.50 per lot (maximum $2,260)
Commercial / Industrial $180 + $17.50 per acre (maximum $2,370)
Board of Zoning Appeals Request Fee
Residential $105 + $11.50 per lot (maximum $1,230)
Planned Development $120 + $11.50 per lot (maximum $2,260)
Commercial / Industrial

$180 + $17.50 per acre (maximum $2,370)

historic preservation commission request Fee
Residential $105 + $11.50 per lot (maximum $1,230)
Planned Development $120 + $11.50 per lot (maximum $2,260)
Commercial / Industrial

$180 + $17.50 per acre (maximum $2,370)

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Windows Media Player Download Word Viewer Download Excel Viewer Download PowerPoint Viewer